<strike id="csqei"></strike>
<pre id="csqei"></pre>
<ul id="csqei"></ul>
<strike id="csqei"><s id="csqei"></s></strike>
  • <ul id="csqei"><pre id="csqei"></pre></ul>
    五月激情婷婷丁香,99国产精品99久久久久久,成人免费va视频,亚洲精品第一国产麻豆,国产精品自在线拍国产,久久国产成人精品国产成人亚洲,国产一级农村无码,中文亚洲日韩欧美
    Welcome to Jiangsu Tianling Instrument Co., Ltd.
    Chinese English Service hotline:189-2189-9789
    Products
    當前位置:Home>>News>>Technical
    分享至:

    Maintenance of vacuum pump of vacuum drying oven
    Issue date:2022/03/08    Views:22    Classification:Technical

    1. Generally, the vacuum pump should be overhauled after 2000 hours of operation, check the aging degree of the rubber seal, check whether the exhaust valve disc is cracked, and clean up the dirt deposited on the valve disc and exhaust valve seat. Clean the parts in the whole vacuum pump cavity, such as rotors, rotating blades, springs, etc. It is usually washed with gasoline and dried. After cleaning the rubber parts, dry them with a dry cloth. When cleaning and assembling, handle with care to avoid bumping.


    2. Start the motor. When the vacuum pump operates normally, turn on the outlet pressure gauge and the inlet vacuum pump. After it shows appropriate pressure, gradually open the gate valve and check the motor load at the same time.


    3. Check the oil level frequently. If it does not meet the requirements, adjust it to meet the requirements. When the vacuum pump is running, the oil level shall be subject to the center of the oil standard.


    4. Check the oil quality frequently. If the oil is deteriorated, replace it with new oil in time to ensure that the vacuum pump works normally.


    5. When the vacuum pump is to be stopped, close the gate valve and pressure gauge first, and then stop the motor.


    6. After reassembly, the test run should be carried out. Generally, it should be operated in an empty state for 2 hours and the oil should be changed twice. Because a certain amount of volatile substances will be left in the vacuum pump during cleaning, it can be put into normal operation after normal operation.


    7. The oil change period shall be considered according to the actual service conditions and whether it can meet the performance requirements, and shall be decided by the user at his discretion. Generally, when a new vacuum pump is used to pump clean and dry gas, it is recommended to change the oil once every 100 hours. When ferrous metal powder is not visible in the oil, the oil change period can be appropriately extended in the future.


    8. Add bearing lubricating oil into the bearing body, observe that the oil level should be at the center line of the oil standard, and the lubricating oil should be replaced or supplemented in time.


    9. Adjust the packing gland frequently to ensure that the leakage in the packing chamber is normal (it is appropriate to leak in drops).


    10. Jog the motor to see if the motor turns correctly.


    11. Try to control the flow and head of the vacuum pump within the range indicated on the label to ensure that the vacuum pump operates at the efficiency point, so as to obtain the energy-saving effect.


    12. Unscrew the water diversion plug of the vacuum pump body and fill the water diversion (or slurry diversion).


    13. If the vacuum pump is found to have abnormal sound, stop immediately to check the cause.


    14. During the operation of the vacuum pump, the bearing temperature shall not exceed the ambient temperature of 35C and the temperature shall not exceed 80C.


    15. Check whether the vacuum pump pipeline and joint are loose. Turn the vacuum pump by hand to see if it is flexible.


    16. The lubricating oil of the vacuum pump shall be changed every 100 hours within the working month, and then every 500 hours.


    17. Clean the pipe if possible to ensure that the pipeline is unblocked.


    18. Regularly check the wear of the shaft sleeve, and replace it in time after the wear is large.


    19. Close the gate valve, outlet pressure gauge and inlet vacuum gauge of the water outlet pipeline.


    20. If the vacuum pump is out of service for a long time, it is necessary to disassemble the pump completely, wipe the moisture, coat the rotating parts and joints with grease, install them, and keep them properly.


    21. When the vacuum pump is used in cold winter, after stopping, unscrew the drain plug at the lower part of the pump body to drain the media. Prevent frost cracking.


    National free consultation hotline:400-928-3898

    Mailbox:jstenlin17@163.com

    Address: No. 4, Zhonglian Road, Baocai Industrial Park,
    Yandu District, Yancheng City.

    CopyRight ? 2022 Jiangsu Tianling Instrument Co., Ltd. copyright   Su ICP Bei 17018543-1
    主站蜘蛛池模板: 男人的天堂av网站一区二区| 精品日本韩国一区二区三区| 五莲县| 日本一道dvd在线中文字幕| 在线视频青青草猎艳自拍69| 同江市| 南华县| 国产颜射视频在线播放| 日本在线免费观看一二区视频| av最新版天堂在资源在线| 韩日无码不卡| 楚雄市| 丰都县| 中文乱码人妻一区二区三区在线| 国产一区二区三区高清在线| 完整在线视频免费黄片| 少妇av免费在线播放| 丰满人妻一区二区乱码中文电影网 | 麻豆精品三级国产国语| 亚洲天堂中文字幕乱码| 国产一级淫片a免费播放口| 国产精品毛片av久久| 亚洲爆码一区二区三区| 日本岛国大片不卡人妻| 久久精品国产亚洲av热明星| 青青青国产免A在线观看| 久久精品国产成人午夜福利| 在线观看极品裸体淫片av| 亚洲国产精品久久九色| 国产精品女主播在线观看| 国产精品一区二区久久毛片| AV熟妇导航网| 亚洲国产不卡av一区二区三区| 亚洲青青草视频免费观看| 国产91一区二这在线播放| 无码人妻专区一区二区三区| 国产盗摄老熟女视频一区二区三区| 亚洲综合久久1区2区3区| 欧美洲精品亚洲精品中文字幕| 人妻少妇被猛烈的进入| 一本色道久久综合中文字幕|